Leave a Message
Leave a message
EnglishEnglish

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Water Barrier | Flexible Portable Flood Barrier

Discover the LTCANOPY Flexible Portable Flood Barrier, specially designed for rapid urban emergency response. Constructed with high-strength flexible materials, it can be quickly deployed and stabilized by water filling weight to effectively block floodwater. Portable and easy to store, it is suitable for building entrances, river interception and construction diversion. Contact us now for customized solutions!
Availability:
Quantity:

PDF Export

  • LT-G005

  • LT

Discover the LTCANOPY Flexible Portable Flood Barrier, a modular reusable flood defense solution designed for rapid urban emergency response. Made of high-strength flexible PVC coated tarpaulin, our flood barrier can be quickly deployed without heavy machinery. It achieves self-stabilization relying on the weight of filled floodwater, forming a reliable retaining wall to block incoming water. Lightweight for transport and compact for long-term storage, it replaces traditional sandbags for modern flood prevention projects.

Item

Standard size - Length(m)

Standard size - Width(m)

Standard size - Height(m)

Standard size - Weight(one unit).KG

Packing dimension - Length(m)

Packing dimension - Width(m)

Packing dimension - Height(m)

Packing dimension - Weight(one unit).KG

1

2

1.3

0.35

7

1

0.17

0.17

9

2

3

1.3

0.35

10

1

20

20

12

3

6

1.5

0.6

20

1.5

25

25

22

4

9

1.5

0.6

30

1.5

30

30

32

Our Advantages

000
1(1)

Fast Deployment

Quick layout by small teams, no pump or power required

2(1)

Customizable

Custom length, barrier height and color for project requirements

6(1)

Modular Splicing

Supports straight, 90° corner and U‑shaped arrangement

7(1)

Durable & Reusable

Heavy‑duty waterproof fabric, foldable after cleaning & drying

1(1)

Portable Storage

Roll‑able design to save warehouse space.


Water‑filled flood barriers vs traditional sandbags comparison chart

Wide Application Scenarios

Our flexible flood barrier serves multiple flood control scenarios:

Urban street emergency flood protection

Building entrances, underground parking garages and subway gateways

River interception, temporary water diversion for hydraulic projects

Construction site diversion, tunnel and basement flood prevention

Commercial parks, industrial factory flood protection.

Flood Barrier Application for Urban Street Flood Protection
Street
Flexible flood barrier protecting underground garage entrance
Garage Entrances
Portable flood barrier installed at residential house entrance
House Entrances
Flexible water‑filled flood barrier used for river channel flood control
River Channels
Portable flood barrier deployed around commercial building perimeters
Building Perimeters
Flood Barrier Application Along Fence Boundary
Fences

Working Principle

Working principle diagram for self‑deploying water‑filled flood barrier

When floodwater flows into the internal cavity of the portable flood barrier, the water weight creates downward anchoring pressure. The whole structure is self-supported and locked in place passively. The more the water level rises, the more stable the barrier becomes, delivering instant flood resistance.

Product Detail Analysis

Water‑filled flood barrier structural details & component analysis diagram

Our water‑filled flood barrier is built with premium‑grade components for reliable flood protection. Constructed from durable PVC coated tarpaulin, this superior waterproof material delivers long‑term service life. It features a high‑flow release hole for quick water drainage, secure velcro closure for easy assembly, reinforced iron plate base for stable anchoring, and sturdy securing straps for firm fixing. Every detail is optimized for fast deployment, excellent sealing and repeated use in emergency flood‑fighting scenarios.

Customizable Product Options

Various customizable types of water‑filled flood barrier product display

Raw Material Analysis

Material: PVC Coated Tarpaulin | Application: Flood Barrier | Feature: High Strength

Material performance analysis for water‑filled flood barrier PVC tarpaulin

Performance feature icons for water‑filled flood barrier tarpaulin material

Our flood barrier material delivers outstanding comprehensive performance. It is windproof, anti‑mildew, fireproof, waterproof, anti‑UV and eco‑friendly. These excellent properties ensure long‑term service even under harsh outdoor conditions.

Material & Performance Test Report

Our flood barrier raw materials have passed authoritative SGS lab tests, including waterproof, flame retardant, pressure resistance and water pressure burst test. Each index meets industrial‑grade standards, ensuring reliable safety and stable performance for flood‑defense projects worldwide.

SGS test reports for flood barrier raw material waterproof, flame‑retardant performance

Installation & Storage

Water‑filled flood barrier installation, storage and connection step diagram

Packaging & Shipping

Flood barrier testing, folding, packing and whole delivery process flow chart

bg

IN‑HOUSE FLOOD‑DEFENSE LABORATORY

Our in‑house flood‑defense lab delivers large‑flow simulation up to **100 m³ in 5 minutes**. Real‑world flood scenarios are replicated to conduct impact, sealing and pressure tests for reliable flood barrier quality.

%

Sensitivity

%

Specificity

%

Accuracy

Laboratory Test Video
Outdoor Test Video

Flood barrier global project timeline, real‑world engineering case gallery

FAQ

How many workers are needed for deployment?

1–2 workers can finish the layout quickly.

Can the flood barrier make 90-degree corners?

Is it reusable after flood use?

Can you offer customized sizes?

About Us

An experienced manufacturer of PVC tarpaulin & emergency flood‑protection products

Founded in 1996 in Shishan, Nanhai, Foshan, we specialize in R&D, production and global export of PVC‑coated fabrics and emergency‑protection products.

Our modern plant features automated production lines for 24‑hour constant‑temperature manufacturing. Our product range includes PVC tarpaulins, flexible mobile flood barriers, inflatable water platforms, water bladders, ventilation ducts, noise barriers and aquaculture pools, widely used in flood emergency, infrastructure, water recreation, industrial and agricultural sectors.

We operate an **in‑house flood‑defense laboratory** simulating flood flow of **100m³ within 5 minutes**. On‑site tests cover hydrostatic burst, flame retardancy, waterproof and tear‑resistance. Core products are SGS‑certified. With multiple utility patents, we offer OEM & ODM customizations on size, color and logo.

We export globally to municipal departments, contractors and B2B partners, providing one‑stop solutions from raw materials to finished‑product project support.

Great value enjoyment

The quality is excellent and fully matches the seller’s description. I am very satisfied and really like the product, which exceeds my expectations. Fast delivery with careful and solid packaging. The logistics provider offers great service. It has been a highly satisfying purchase.

Reasonable Price

7*24 Hours Service

Litong factory overview: workshop, production line and showroom display

International Exhibitions

Litong overseas exhibition show, displaying flood barrier products for global buyers

Contact LTCANOPY now to get your customized flexible portable flood barrier solution for your flood control project!

Previous: 
Next: 
Export Factory-Branch Litong Fanpeng Co, Ltd. is specialized in exporting different of tarpaulin to all over the world. kuweit, thailand, uk, usa, chile, switzerland...
Quick Navigation

Product Category

Product Category

Others

Contact Us

 Building 1, No.88, Xingye East Road, Henggang, shishan Town, Nanhai District, Foshan City,Guangdong province , China , 528225
 86-18826644063
 cat-lt@ltcanopy.com

Leave a message
© 2021 - FoShan LiTong FanPeng Co. ,LTD.All rights reserved. Support By Leadong   | sitemap